LED COB Outdoor In-ground Recessed Light DC12-24V
-
Price:
Negotiable
- minimum:
- Total supply:
-
Delivery term:
The date of payment from buyers deliver within days
-
seat:
Beijing
-
Validity to:
Long-term effective
-
Last update:
2022-05-13 15:56
-
Browse the number:
340
Company Profile
Shanghai Ever International Corp., LtdBy certification [File Integrity]
Contact:everintl2(Mr.)
Email:
Telephone:
Phone:
Area:Beijing
Address:Beijing
Website:http://www.hydgetlighting.com/ http://everintl2.nh0668.com/
Product Details
Product Introductions:
Model | DAY04OIL0010EU |
Materials | 304 stainless steel, aluminum |
Power | 3W |
LED Chip | Epistar LED |
Lumens | 250Lm |
CRI | >80Ra |
Beam angle | 90° |
Voltage | DC12-24V |
Color | 3000K,4000K,6000K |
Others | Red,Green,Blue |
Size | Ø48XH58mm,Opening size:Ø36-40mm,depth>62mm |
IP Rate | IP67 |
Warranty | 3 Years |
Detail display:
1.Epistar COB LED
2.90degree beam angle
3.304 Stainless steel cover
4.Steel shrapnel
5.Waterproof nut
6.Waterproof connector
7.High temperature wire
8.6063 aluminum lamp body
INSTALLATION
Wiring method 1
Pre-wire laying (low-voltage end divided into positive and negative wiring)
1.Cut off the waterproof terminal of the lamp
2.Connect the lights in parallel to the pre-arranged main wire
3.After the main wire is connected to the constant voltage power supply/transformer, then connected to 110V/220V
Wiring method 2
1.Pre-wire laying (low-voltage end divided into positive and negative wiring)
2.Cut off the waterproof terminal of the lamp(Male end)
3. The extension wire is connected in parallel to the pre laid main wire
4. The male end of the waterproof terminal of the lamp is connected with the female end of the extension wire
5.After the main wire is connected to the constant voltage power supply/transformer, then connected to 110V/220V
Wiring method 3
1.The diversion and extension wire is 0.3 square wire.
2.1W lamp, it is recommended to connect up to 20 lamps per group
3.3W lamp, each group is recommended to connect up to 8 lamps per group
Installation method 1: direct opening installation
Wooden board, gypsum board, marble or already done wall, etc., you can directly open the hole to install, as follows
Installation method 2: Installation with embedded parts
Installed with pre-buried parts, generally applied to concrete, lawn, etc. to facilitate fixed lights, as follows:
http://www.hydgetlighting.com/
- Bath Mat
- Bathroom Fittings & Accessories
- Bathtub
- Faucet, Tap & Mixer
- Kitchen Appliance
- Sauna Room
- Shower Head & Shower Set
- Shower Room & Shower Enclosure
- Sink & Basin
- Toilet & Accessories
- Concrete,Mortar & Admixtures
- Sand, Lime & Plaster
- Slate, Marble, Granite & Stone
- Brick, Tile & Accessories
- Floors & Flooring
- Blinds, Shades & Shutters
- Door
- Door & Window Hardware
- Door Handle
- Door & Window Hinges
- Other Door & Window Hardware
- Door & Window Slide
- Curtain Rod
- Door Closer
- Door Stop
- Door & Window Bolt
- Door Opener
- Door & Window Hook
- Door & Window Roller
- Window Screening
- Door Viewer
- Patch Fitting
- Curtain Track
- Window Handle
- Door Curtains
- Curtain Rod Accessories
- Curtain Track Fittings